Electric Qualified Applicant Designers for PG&E
559-575-8221

Why Applicant Design?

Applicant Design was created by the California Public Utilities Commission in 1995, allowing developers to choose independent designers to design their projects.

Applicant Design provides developers and PG&E customers with the option to hire a consultant like Lopes Utility Design Services to design the electric facilities for your development project instead of having PG&E provide the design work.

Lopes Utility Design can complete your design accurately and efficiently. Our timelines are normally shorter than PG&E.

Lopes Utility Design is staffed with several engineers who are PG&E Qualified Applicant Designers.

ABOUT US

We are a PG&E Electric Qualified Applicant Design firm providing electric utility design services in California.

QAD Certified

Lopes Utility Design has 4 designers with PG&E's Qualified Applicant Designer (QAD) certification

Experienced Staff

Lopes Utility Design has 5 electric designers & drafters with over 6 decades of cumulative Applicant Design experience

Industry Leader

Lopes Utility Design has designed more than 4,000 projects since 2008 and is one of the leading Applicant Design firms in California

 

Cliff Lopes, Principal

Cliff Lopes worked for PG&E for 34 years. Upon retiring from PG&E as an Electric Associate Distribution Engineer (ADE) in 2008, he founded Lopes Utility Design Services to provide Applicant Design services to the industry.

SERVICES

We provide full electric utility design services for all types of projects. These are typical services we offer:

 

Click each menu item for details...

Construction Drawings

The construction plan for your project

We provide both construction drawings and PG&E-required circuit sketches.

Our drawings:
•  Show where to install equipment, conduits, and cables, as well as what and how much to install
•  Are Easy-to-follow for construction crews to install your project correctly
•  Comply with all PG&E standards and guidelines
•  Include all PG&E-mandated calculations and equipment installation notes
•  Provide the basis for a Joint Trench contractor's Composite Drawing, showing all dry utilities' installation facilities

Click image for more detail...

Calculations

PG&E-mandated calculations to meet their standards

We provide all the technical calculations necessary to comply with PG&E standards. Typical calculations include:
•  Tranformer sizing
•  Conductor sizing
•  Conductor tail lengths
•  Secondary & Service voltage drop
•  Voltage rise from solar-generation facilities
•  Conductor pulling tension
•  Pole sizing for overhead facilities
•  Guying requirements for overhead facilities
•  Adding additional load to existing facilities
•  Panel loading demand conversions
•  Total project current demand

Click image for more detail...

Material List

Job Instructions and material quantities for all equipment, conduits & cable

Our job instructions divide your project into small components and provide specific details on what equipment, conduit, and cable to install for each component.
This easy-to-follow list helps contractors do the installation work accurately and efficiently.

Our material list summary provides the total quantity of each material item that must be ordered for the installation of your project. This makes bulk orders much simpler.

Our job instructions & material list are completed to PG&E standards.

Click image for more detail...

OCalc Analysis

Analysis for pole loading calculations

PG&E requires overhead facilities to be modeled and load-analyzed using industry-leading OCalc software.

We provide expertise in modeling poles, risers, transformers, fusing, switches, reclosers, and capacitor banks.

We determine guying requirements for poles based on loading analysis.

We ensure all overhead facilities are according to PG&E standards and in compliance with General Order 95.

We provide information on Joint Pole Association requirements to coordinate with other dry utility providers.

Click image for more detail...

Field Survey

We can provide on-site information gathering services

We can gather on-site information for your project to ensure our design is accurate to your in-the-field conditions.

We can provide measurements & sizing determination for existing facilities, as well as mapping existing facilities.

Click image for more detail...

Revisions

As changes occur, we will adjust our design

Should changes happen on your project during construction or pre-construction, we will work with you to adjust our design and ensure your project is completed to PG&E standards.

We are with you until you power on!

Partnership

Many partners working together to complete your project

We will work with all your partner contractors to bring your project to completion.

Typical partner contractors include:
•  Joint Trench Consultant
•  Gas Design Contractor
•  Composite Drawing Designer
•  Civil Engineer
•  Electrical Utility Equipment Buyer

Projects

Lopes Utility Design has designed more than 4,000 Applicant Design projects for PG&E since 2008.
Some recent featured projects include:

Residential Subdivision
274 Lots
5 Phases
Developed by Wathen Castanos Homes
Website

Sea Haven

Marina, CA

Residential Subdivision
277 Lots
4 Phases
Developed by Pulte Group
Website

Pantages

Discovery Bay, CA

Residential Subdivision
676 Lots
In the News

Oakwood Trail

Manteca, CA

Residential Subdivision
500+ Lots
8 Phases
Developed by Stonefield Home
Website

Southpointe

Los Banos, CA

Residential Subdivision
400+ Lots
4+ Phases
Developed by Stonefield Home
Website

Tesoro Viejo

Madera, CA

Residential Subdivision
500+ Lots
5+ Phases
Developed by Wathen Castanos, Wilson Homes & Lennar
Website Website Website

Riverstone

Madera, CA

Contact

Please contact us today to discuss your project needs.

We'll provide you exceptional service to bring your project to completion.

Serving all PG&E areas of California

Headquarters

Clovis, California

Call Us

559-575-8221